Top
Home → Boats → Submarines → Upholder Class

1990 - 1994: Upholder Class

HMS Upholder was the first of an entirely new class of diesel-electric submarine to be built for the Royal Navy. It was intended that the Upholder Class would be in service with the RN well into the next century, gradually replacing their predecessors, the Oberon Class.

Upholder cutaway
Upholder cutaway

Originally it was intended to build seven of the class but only four were produced.

The Upholder design benefited considerably from the research and development programme carried out for the Royal Navy's nuclear-powered Fleet Submarines. The hull form, in particular, embodies features, which have been derived from the extensive hydrodynamic testing carried out in connection with these latest-generation SSNs.

The two subs here are Osiris and Unicorn, the O Boat is being taken apart as spares for the Canadians, Unicorn is either getting ready for trials or just back from them, the dock is 5 dock, just over the wall from the Birkenhead Priory
The two subs here are Osiris and Unicorn, the O Boat is being taken apart as spares for the Canadians, Unicorn is either getting ready for trials or just back from them, the dock is 5 dock, just over the wall from the Birkenhead Priory

Propulsion

The propulsion system propulsion system comprises two high-speed diesel engines, each of which is coupled to a 1.4 MW generator, and a double-armature main motor, which drives a single propeller. The generators can be used either to provide power to the main motor directly or to charge the boat's main battery.

With two motors on a common frame driving a single propeller. It is conceivable that in future they could be fitted with fuel cell technology (Air Independent Propulsion).

Tactical Weapons System

The Upholder Class have six bow-mounted weapon discharge tubes, each capable of discharging dual-purpose wire-guided heavyweight torpedoes, anti-ship missiles and submarine mines.

HMS Upholder entering Walney Channel. The new dock gates to accommodate Trident were under construction in the background
HMS Upholder entering Walney Channel. The new dock gates to accommodate Trident were under construction in the background

Command System

A fully integrated computerised sonar suite provides long-range detection and attack capabilities. Information from the sensors is digitally processed and passed by link to a central Action Information Organisation (AIO) computer, where it is displayed in a coherent form for the Command Team.

The system also processes visual data from the periscopes, information from the radar and ESM masts and manual inputs such as navigational data.

Communications

The external communications system provides reception facilities across a wide spectrum of radio frequencies, and transmission within the military, HF, VHF and UHF bands.

Complement

The maximisation of remote control and automatic surveillance systems has resulted in a reduction of the Ship's Company from 120, for a similarly equipped SSN, or 75 for the much more labour-intensive Oberon Class, to a total of 47 - comprising 7 Officers, 16 Senior Ratings and 24 Junior Ratings.

During the design phase, considerable emphasis was placed on improvements to the living standards onboard.

Upholder passing through the Thames barrier
Upholder passing through the Thames barrier

Reactivation

In 1998, after much speculation the Upholder Class were sold to Canada and a programme of reactivation began at the Barrow yard. The first vessel to receive the attentions of the yard was HMS Unseen which took on the mantle of first of class when commissioned as HMCS Victoria.

The collection of photographs to the right shows HMS Unseen being lifted out of the water and moved inside the huge Devonshire Dock Hall for her six month long docking period.

The Hall was initially built to support the Trident Submarine programme and it includes Workshops, Offices, Machine Shops, Pipe Manufacturing Facilities and just about everything else the shipbuilder needs in one location. Thus the majority of the tasks required to reactivate the boats is undertaken during this period ashore.

There is a Canadian Naval tradition of naming vessels after Canadian communities to establish a tangible and enduring link between the Canadian Navy and and its people.

The criteria for the selection of names for the subs was further refined to consider communities that have an association with the Atlantic/Pacific coasts or a major Canadian waterway. Thus four Canadian port cities were selected.

This will also enable the Canadian Navy to foster strong ties with these communities and the surrounding regions.

The full transformation proceeded as follows:

Reactivation
Order
Build Order
1 2 Unseen Victoria
2 4 Unicorn Windsor
3 3 Ursula Cornerbrook
4 1 Upholder Chicoutimi

Add A Comment (click to open)

This form is for you to comment on, or add additional information to this page. Any questions will be deleted. If you wish to ask a question contact the Branch or the Webmaster using the Contact Us page or ask your question on our Facebook Page

Name E-Mail
Your email will not be shown, but is required
Anti Spam: Type the following code exactly as shown into the box below.

YN2U    
Note: All submissions are subject to approval prior to appearing on the page. As a SPAM prevention measure, any comments containing links to other sites will be automatically discarded.

1983 - 2025: Trafalgar Class 1993 - Present: Vanguard Class