Thank you for helping to improve this site by reporting an error on the P 556 page.
Thorn (N 11) |
|
| Class: | 1935 - 1970: T Class |
| Built By: | |
| Build Group: | T 2 |
|
Fate: Believed to have been sunk 'With All Hands' on 6th August 1942 after an attack on an Italian convoy in the Mediterranean in position 34°25'N, 22°36'E. A Ju-88 aircraft had been seen to make a machine-gun attack ahead of the convoy. The Italian torpedo boat Pegaso then detected a contact and carried out a series of depth charge attacks. After seven attacks, a large air bubble was seen, as was a large oil slick. HMS Thorn had been expected to arrive at Beirut but was declared overdue on 11th August 1942 when she did not arrive. |
|
After the narrow defeat of their U-boat fleet in the First World War, the German Navy analyzed their experiences and devised new theories and plans for a future conflict.
The principal result of this study was the development of the daring concept of Rudeltaktik, which involved co-ordinated pack attacks on the Allied convoy systems that had proved so successful in defence
13 pages added or updated in the last 1 month
Please help to maintain this site by reporting any Errors, Broken Links, Information or Site Issues on this page using this button
If you find this site useful, please consider supporting my work with a small Donation.
Please Note: Donations made using this option go directly to the site owner and not to the Submariners Association.
Thankyou for your support.
Thorn (N 11) |
|
| Class: | 1935 - 1970: T Class |
| Built By: | |
| Build Group: | T 2 |
|
Fate: Believed to have been sunk 'With All Hands' on 6th August 1942 after an attack on an Italian convoy in the Mediterranean in position 34°25'N, 22°36'E. A Ju-88 aircraft had been seen to make a machine-gun attack ahead of the convoy. The Italian torpedo boat Pegaso then detected a contact and carried out a series of depth charge attacks. After seven attacks, a large air bubble was seen, as was a large oil slick. HMS Thorn had been expected to arrive at Beirut but was declared overdue on 11th August 1942 when she did not arrive. |
|
After the narrow defeat of their U-boat fleet in the First World War, the German Navy analyzed their experiences and devised new theories and plans for a future conflict.
The principal result of this study was the development of the daring concept of Rudeltaktik, which involved co-ordinated pack attacks on the Allied convoy systems that had proved so successful in defence
13 pages added or updated in the last 1 month
Please help to maintain this site by reporting any Errors, Broken Links, Information or Site Issues on this page using this button
If you find this site useful, please consider supporting my work with a small Donation.
Please Note: Donations made using this option go directly to the site owner and not to the Submariners Association.
Thankyou for your support.
